ABFAD – Installation of two blister tanks both sides of the semi submersible oil rig. All welding and NDT carried out for this project utilizing rope access and permanent magnets to get men into the right position for welding.
DatsoGallery Multilingual By Datso.fr
Account Login
Wembley Stadium Project
ABFAD Ltd was one of the major contributing companies in meeting mile stone targets to complete the stadium, over a 18 month period on all high level areas.
ABFAD has been in the forefront of new developments and applications, for instance improving equipment and training personnel to apply solvent free coatings with no volatile organic compounds (VOC) to help protect the atmosphere ozone layer, company personnel and general public.
Abfad personnel are competent to access high level structures in most industries from Power Generation, Oil and Gas to Football Stadiums, Heavy Cranes, Buildings etc.